{"page":{"id":156,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://yardflag.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-11-14\">November 14, 2026</time></p>\n<p>Most order changes at Yard Flag come down to one thing: something typed in a hurry. A surname with a stray apostrophe, a garden flag picked when the porch bracket wanted a house flag, a housewarming gift sent to the old address. This page explains how to cancel an order or change it, how long you have, what can be changed, and what happens to your money when an order is cancelled. Email <a href=\"mailto:support@yardflag.shop\">support@yardflag.shop</a> with your order number as soon as you notice; we reply within 24 hours on business days.</p>\n<section class=\"policy-summary\">\n<h2>Cancelling or changing at a glance</h2>\n<ul>\n<li><strong>Window:</strong> cancel or change within 24 hours of ordering.</li>\n<li><strong>How:</strong> email us with your order number and exactly what should change.</li>\n<li><strong>Refund for a cancelled order:</strong> sent within 7 days of our cancellation confirmation.</li>\n<li><strong>After 24 hours:</strong> contact us anyway and we will tell you what is still possible.</li>\n<li><strong>Already delivered:</strong> every item can be returned within 60 days of delivery, personalised pieces included.</li>\n</ul>\n</section>\n<h2>1. The 24-hour window</h2>\n<p>You can cancel or change an order within 24 hours of placing it. The 24 hours run from the time on your order confirmation email, so an order placed at 8:15 on a Sunday evening can be changed until 8:15 on Monday evening. Weekends count in this window; it is 24 clock hours, not business days.</p>\n<p>The window is short for a reason. Every flag, doormat, sign and gift is prepared after you order, and that making time is 1-3 business days. Once work on your order has started, a change may no longer be possible. Writing to us early is the single best way to get the change you want.</p>\n<h3>What &#8220;within 24 hours&#8221; means in practice</h3>\n<p>Your request counts from the time your email reaches us. You do not need to wait for our reply before the 24 hours end; the time stamp on your message is what we go by. Your change is final once you receive our confirmation email describing exactly what we changed.</p>\n<h2>2. How to ask for a cancellation or change</h2>\n<ol>\n<li>Email <a href=\"mailto:support@yardflag.shop\">support@yardflag.shop</a> or <a href=\"/submit-ticket/\">submit a ticket</a>. A subject line such as &#8220;Change order&#8221; or &#8220;Cancel order&#8221; with the order number helps.</li>\n<li>Give your order number and the email address you used at checkout.</li>\n<li>Say exactly what should change. For a family name piece, type the corrected line in full, the way it should print, rather than describing the change.</li>\n<li>Wait for our confirmation email. It repeats the change back to you. Read it carefully; that text is what we work from.</li>\n</ol>\n<p>If you have more than one change, put them all in the same email. Two short emails sent ten minutes apart are easy to read in the wrong order.</p>\n<h2>3. Changes we can make within 24 hours</h2>\n<table class=\"policy-table\">\n<caption>Common Yard Flag order changes and what to send</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">What to include in your email</th>\n<th scope=\"col\">Note</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Garden flag to house flag, or the reverse</td>\n<td>The design and the size you want</td>\n<td>The house flag adds $14</td>\n</tr>\n<tr>\n<td>A different design</td>\n<td>The product name you want instead and its size</td>\n<td>Prices differ between products</td>\n</tr>\n<tr>\n<td>Family name, &#8220;Est.&#8221; year or house number</td>\n<td>The full corrected line, exactly as it should print</td>\n<td>We print exactly what is confirmed</td>\n</tr>\n<tr>\n<td>Porch leaner height</td>\n<td>4 ft or 5 ft</td>\n<td>The 5 ft sign adds $10</td>\n</tr>\n<tr>\n<td>Pillow or mug size</td>\n<td>16 x 16 in or 18 x 18 in; 11 oz or 15 oz</td>\n<td>Prices differ between sizes</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>The full new address, including unit number</td>\n<td>United States, Canada, Australia or New Zealand only</td>\n</tr>\n<tr>\n<td>Remove an item</td>\n<td>Which item and how many</td>\n<td>The removed item is refunded</td>\n</tr>\n</tbody>\n</table>\n<p>If a change affects the price, we tell you the difference by email before anything is changed, and we work out the next step with you. To add a new item, the simplest route is a second order; shipping is free, so ordering twice costs nothing extra.</p>\n<h2>4. Fixing a family name before it is made</h2>\n<p>The Family Name Welcome Flag, Family Name Doormat, Family Name Porch Leaner Sign and Family Name Mailbox Cover print exactly what was typed: spelling, capitals and punctuation. No proof or mockup is sent before production. The live preview on the product page, the cart, the checkout and your order email all show the same text, so the order email is your last easy chance to read it.</p>\n<h3>Example: &#8220;The Miller&#8217;s&#8221;</h3>\n<p>A buyer orders the Family Name Doormat and types &#8220;The Miller&#8217;s&#8221; in the Family name field. Reading the order email the next morning, he notices the apostrophe. An apostrophe means &#8220;belonging to&#8221;, so &#8220;The Miller&#8217;s&#8221; reads as something owned by one Miller, not a welcome from the whole household. Because it is still inside 24 hours, he emails us the corrected line, &#8220;The Millers&#8221;, and our confirmation repeats it back to him. That is the whole fix.</p>\n<p>The plural rule is short: add -s for most names (The Millers, The Garcias, The Nguyens), and add -es after s, x, z, ch or sh (The Joneses, The Foxes, The Churches). There is no apostrophe in a plural. This is a formatting hint only; type whatever you want printed, and we print it as confirmed.</p>\n<h3>Example: the &#8220;Est.&#8221; year</h3>\n<p>The optional &#8220;Est.&#8221; year takes four digits. A couple ordering the Family Name Porch Leaner Sign for their tenth anniversary types 2061 instead of 2016. Within 24 hours, a one-line email with the corrected year is enough. After that, the sign may already be in production, and the route is a return within 60 days of delivery and a new order.</p>\n<h3>The mailbox cover house number</h3>\n<p>The Family Name Mailbox Cover has an optional house number of up to 6 characters. Check it against the number on the house, not the one in your memory; buyers who have just moved sometimes type the old one. Leave it blank if you do not want a number printed.</p>\n<h2>5. Changing the shipping address</h2>\n<p>Within 24 hours of ordering, we can correct the shipping address. Send the full new address in one block: name, street, unit or apartment number, town, state or province, ZIP or postal code and country. For Australian and New Zealand addresses, include the suburb.</p>\n<h3>Example: the housewarming gift</h3>\n<p>A buyer sends the Plain Welcome Stripe flag as a housewarming gift, then realises she used her friends&#8217; old address from her contacts. She writes the same evening with the new address and the name that will be on the new mailbox. We confirm the change, and the gift is sent to the new house. The order confirmation and any updates still come to her, as the buyer.</p>\n<p>We deliver only to the United States, Canada, Australia and New Zealand, so an address can only be changed to another address in those four countries. Once a parcel has left us, we may not be able to change where it goes; contact us anyway and we will help where we can.</p>\n<h2>6. Cancelling an order and your refund</h2>\n<p>To cancel within 24 hours, email us with your order number and the word &#8220;cancel&#8221;. You can cancel a whole order or one item from it. Once we confirm the cancellation, your refund is sent within 7 days of our confirmation, to the payment method used for the order. How refunds reach your account is explained on our <a href=\"/refund-policy/\">Refund Policy</a> page.</p>\n<p>Because shipping is free, there is no shipping charge to recover on a cancelled order. If you would rather have store credit than a refund, say so in your email; store credit never expires, which suits a buyer who wants to wait for next season&#8217;s designs.</p>\n<h3>Cancelling a seasonal order you no longer need</h3>\n<p>Sometimes plans change because the calendar does. A buyer in Christchurch orders the Snowfall Welcome doormat for December, then remembers that December is summer in New Zealand and Christmas there falls in the warm months. If she writes within 24 hours, she can cancel the mat or swap it for a summer design. The homepage <a href=\"/#swap-ring\">swap ring</a> set to South shows which designs go up when in the southern seasons.</p>\n<h2>7. After the 24 hours</h2>\n<p>Once 24 hours have passed, the order may already be in its 1-3 business days of making, and we cannot promise any change. Email us anyway with your order number and what you need. We will tell you honestly whether the change is still possible.</p>\n<p>If the order has already been made or sent, you do not lose anything. Every item, including the four personalised pieces, can be returned within 60 days of delivery, and we pay the return postage for a change of mind with a free return label. The steps are on our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a> page.</p>\n<h3>If we cannot complete an order</h3>\n<p>If we ever find we cannot fulfil an order as placed, we email you to explain the options. If the order is cancelled, the refund is sent within 7 days of our cancellation confirmation, the same as a cancellation you ask for.</p>\n<h3>Ordering the next season early</h3>\n<p>Some buyers place their harvest order in August and their Christmas order at the same time, so the bin by the door is stocked ahead. The 24-hour window applies to each order from the moment it is placed, not from the swap day it is meant for. If you later decide the Christmas Porch Lantern flag should be a house flag rather than a garden flag, and the 24 hours have passed, the order may already be made. In that case the route is a return within 60 days of delivery and a new order for the size you want. Keep this in mind when ordering months ahead: open the parcel when it arrives and check the size against your bracket or stand, rather than waiting until the week you plan to hang it.</p>\n<h3>Two people, one order</h3>\n<p>When a household shares an account, it is easy for two people to ask for two different changes. Our confirmation goes to the email address used at checkout, so agree on the final version first, then send one email, ideally from that address.</p>\n<h2>8. Before you order: a short checklist</h2>\n<p>Most changes can be avoided with two minutes before you pay:</p>\n<ul>\n<li>Measure the spot. A garden flag is about 12 x 18 in and suits a small garden stand; a house flag is about 28 x 40 in and suits a porch bracket and pole. Our <a href=\"/size-guide/\">Size Guide</a> shows both beside a door.</li>\n<li>Remember that every flag is sold as a flag only. No stand, pole, bracket or hardware is in the parcel.</li>\n<li>Every flag is printed on one side, and the design shows through in reverse on the back.</li>\n<li>Read the family name preview aloud, letter by letter, then read it again in the cart.</li>\n<li>Check the shipping address, especially the unit number, for gifts.</li>\n<li>Count back from your swap day: 1-3 business days to make plus 7-14 business days in transit means allowing up to 17 business days. That is an estimate from our stated times, not a guarantee. More on the <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page.</li>\n</ul>\n<h2>9. Contact us about an order you just placed</h2>\n<p>Email <a href=\"mailto:support@yardflag.shop\">support@yardflag.shop</a> with your order number, or <a href=\"/submit-ticket/\">submit a ticket</a>. We reply within 24 hours on business days. To see where an existing order stands, visit <a href=\"/order-tracking/\">Order Tracking</a>. Yard Flag, 1017 Evening Star Dr, Roaming Shores, OH 44085, US.</p>\n","visible_characters":10393,"meta_description":"Cancel or change a Yard Flag order within 24 hours: fix a family name, switch garden to house flag, update the address. Refund sent within 7 days.","parent":null,"published_at":"2026-11-14T04:19:49+00:00","updated_at":"2026-11-14T04:19:49+00:00"}}